Pond Liners - Installation details

1.

Place pallet with c (centre mark) facing the centre of the short side of the hole, as per diagram. Remove strapping and packaging.

 

   

2.

As per direction of arrows on liner, pull out side wings to full length until they can go no further. (1 metre wide)

 

   

3.

Liner now needs to be folded out to 2 metre width. Fold back each fold individually, until the pulling edge is exposed with directional arrows showing. Liner is now approximate 2 metres wide.

 

   

4.

Liner is now ready to pull out. First anchor the last sheet of liner on bottom of pallet - stand 3 men (if possible) on it so as to prevent it falling into hole. Halve your man power for each side of the of liner, now slowly and evenly pull liner along, with a man joining in pulling every second seam approximate. When you get to the far end, ensure that the liner looks evenly placed over the hole.

 

   

5.

Let liner settle into hole. Ensure that there is sufficient liner in all trenches. You may have to pull to adjust liner to fit. Backfill one short side trench, and then chase out any large folds to the corners. (not always possible) Backfill all trenches lightly, sufficient enough to hold liner but also allowing it to move once filling with water. Once hole is full of water you can finish all necessary groundwork, filling trenches and landscaping.

 